Signal Report Date: Jun 12 2017
Rating of: Evaluation of CAE_Droptest_01
Report of Signal 2 of Load Case 1: 00SENS010000VEZC
Overall Rating: 0.977
Versuchskurven Vergleich Versuch-Berechnung

droptest_01
Average of experiments

droptest_02
cross-correlation reference

cae_droptest_01

Limits Outer corridor

Limits inner corridor
Method Name Rating Weight
1 Corridor Method 0.995 0.50
2
Correlation Method
Value Rating Weight
Cross correlation function 1.0 0.999 0.50
Size 0.918 0.918 0.250
Phase shift 0.1 0.916 0.250
0.958 0.50
3 Combination of 1 and 2 0.977 -
Parameters: Evaluation Intervall: 1.4 - 6.7
Method 1: Max. half width of inner corridor: 0.050
Max. half width of outer corridor: 0.50
Corridor curve file:
Reference value: 6.045
Transition exponent: 2
Method 2: Limits for phase shift: 0.1 - 0.6
Rating exponents (shape, size, phase): 10, 1, 1
Previous Signal Up to Loadcase Up to Summary